You patch the racks. Vorker patches the paperwork.

Vorker handles network rollout paperwork: site surveys compiled, quotes drafted, per-site docs filed and warranty renewals watched. You approve everything.

A network installer standing at an open comms rack in a small server room, patching a cable into a switch

FAQ

Will it send anything to a client without me seeing it?

No. Every quote, invoice, update and renewal is prepared and then waits for you. You can read it, edit it, reject it, or approve it and schedule it to go out later. Nothing sensitive happens on its own.

Can it really price a multi-site rollout?

It drafts from your own rates, the survey summaries and how you quoted similar rollouts before: hardware, drops, install nights per site. Treat the first draft as a starting point you adjust. That is still far faster than building the quote at midnight after a survey day.

We are two engineers and a van. Is this overkill?

That is the size it is built for. When there is nobody in an office, the quotes and the site docs land on your evenings, usually after a cutover night. Vorker is made for firms of one to ten people.

How does the site documentation work?

You send the patch schedule, configs and rack photos as each site goes live, and Vorker books them to the right office the same night. When the client asks what is in the rack a year later, the answer is one question away.

How does it know when warranties run out?

Every install files the hardware with its warranty dates. Vorker watches the countdowns and drafts the renewal quote about 90 days ahead. Nothing goes to the client until you approve it.

Do I have to learn a new system?

No. You talk to Vorker the way you would text a colleague, and it works inside the tools you already have: your email, your calendar, your files, your accounting. Quotes and site docs arrive as ordinary PDFs.